On August 14, 2025, Frankie Valenzuela stood before the Woodland Park Planning Commission with a request the commission had heard many times before. He wanted five more years on the Top of Paradise master plan for a 40.69-acre parcel north of Ponderosa Way and east of Majestic Parkway, planned for 38 single-family homes. His reason was short. Now that The Haven at Paradise was complete, the owner wanted to start on the next piece.
The plan he wanted to extend dates to 1999. The neighborhood around that parcel has been growing at that pace for about 20 years, and it shapes what a buyer moving up Ute Pass can expect to find. Woodland Park's new housing is approved well ahead of time and then built a few dozen lots at a time. Most people buying here are choosing from resale homes. Buyers who want new construction are choosing a homesite and a builder, not a model home in a large tract.
Top of Paradise, One Filing at a Time
The land in the Top of Paradise plan was annexed into the city in 1975. City Council approved its first master plan and preliminary plat in 1999, covering 198.5 acres and 120 single-family lots. A 2005 amendment covered 197.7 acres and showed 175 lots, with up to 190 allowed. The 2005 plan has been extended in 2010, 2015, 2020 and now 2025.
The city's staff report in the September 4, 2025 council packet lists what was actually final-platted inside that plan area. Paradise of Colorado Filing 1 had 4 lots in 2006. Filing No. 2 added 29 in 2008, Filing No. 3 added 3 in 2017, and Filing No. 4 added 22 in 2018. The Highlands in Paradise added 9 lots along Highland Court in 2019, and The Haven at Paradise added 24 in 2023. In 2024, Kings Crown was platted as a single lot on 11.34 acres that had been approved for 8.
That comes to 92 lots in seven filings over 18 years. The plan allowed up to 190.
Staff also explained why. Over the decades, large parts of the master plan area were sold to other developers and entities, "some of which have not expressed interest in developing the land." Ventus, LLC, which developed The Haven, bought the undeveloped 40-acre parcel next to it in 2021. The city's Utilities Department has planned for up to 38 water taps there.
At the hearing, Valenzuela said the master plan shows 30-plus lots but the topography may reduce how many can be built. Planners and commissioners spent much of the discussion on open-space tracts and trail access. The commission voted 5–0 to recommend the extension. The Gazette reported that City Council approved the five-year extension at its September 4, 2025 meeting. The new expiration date is August 4, 2030.
So the largest single-family pipeline on the north side of town will add its next homes in a batch of 38 or fewer, sometime before 2030. Buyers comparing Woodland Park with a Colorado Springs suburb that releases hundreds of lots in a phase should adjust their expectations.
Stone Ridge and Tamarac Are Waiting Their Turn
The attached-home pipeline, which would add townhomes and apartments, follows the same pattern.
Pines at Stone Ridge is a nine-acre tract at the northeast corner of Research and Ridgestone drives. It is part of the 200-acre Stone Ridge Village planned unit development, approved in 2004. The Gazette's 2022 coverage explained that the tract was first approved for 58 apartments and 19 patio homes. In 2022, owner Go Beyond LLC asked to change that to 49 townhomes and 20 patio homes spread across the nine acres, with about three acres of open space and two private streets. On June 11, 2026, the Planning Commission granted another two-year extension, moving the project's expiration to April 14, 2028. Citizen Portal reported that the applicant cited market and financing delays and that construction was deferred until conditions improve. The same report says the approved density had already been reduced, and staff pointed to earlier grading and infrastructure permits as evidence of progress.
Tamarac Tech Park, at the end of Tamarac Parkway, was approved in 2021 for 167 dwellings across Lots 6 and 7. A 2023 revision kept 122 units, all on Lot 6. On August 21, 2025, City Council extended the Lot 6 permit to May 18, 2027 for eight apartment buildings holding 122 attached dwellings. The council packet notes that the applicant plans to redesign the project at a lower density with two-story buildings.
Both projects are real and still moving. Both have also gotten smaller since their first approval. For a buyer, any new townhome or patio-home supply in Woodland Park is still at least one approval step away.
What Buying New Looks Like Here
Actual home construction in the city right now is concentrated at The Haven at Paradise. Western Mountain Builders describes its work there as semi-custom and custom homes on 24 homesites, with Phase I well underway. The builder's floor-plan page lists Lot 9 at 1405 Red Haven Place as available. The neighborhood's layout is still being adjusted too. On July 16, 2026, City Council approved The Haven at Paradise Filing No. 2, which replatted Lots 4 and 5 together with a city-owned tract into three lots.
That changes what "buying new" means in Woodland Park. A buyer picks a specific homesite, then a plan, then finishes, on a builder's schedule. That is closer to a custom build than to choosing between three elevations in a model park. It also takes longer. A family relocating from Colorado Springs on a set timeline should plan for that.
Other new-home ideas are at the proposal stage. One local builder's page, published in July 2025, describes a proposed 21-villa subdivision called The Highlands in Paradise. It names the builder as MBI Contractors Inc. "if approved" and lists prices starting in the mid-$500,000s. That is an asking-price range for a proposal, not a project with a construction start.
The Resale Market Is the Market
With new construction arriving a few dozen units at a time, almost everything a buyer tours in Woodland Park is a resale home. The county numbers show how thin that market is.
The Pikes Peak Association of Realtors' October 2026 sales report counted 271 single-family and patio homes for sale in all of Teller County in October 2026, down from 309 in October 2025. Forty-nine sold in October 2026, compared with 57 a year earlier. The median sale price was $450,000 for the month, down from $500,000 in October 2025. In September 2026 it had been $542,900. Homes that sold in October 2026 spent a median of 64 days on market, compared with 62 the October before.
These figures cover the whole county, and they show what a small market does. When fewer than 50 homes sell in a month, a handful of sales can swing the median. Between September and October 2026 it moved by almost $93,000. The steadier figure is the one supply comes from. Teller County's inventory depends on owners deciding to sell, because no builder is adding a 200-home phase to balance it out. A buyer who waits for "the new subdivision" to bring more choices is waiting for a few dozen lots at a time.
The timing works both ways. Days on market in October 2026 were a little longer than a year earlier, and fewer homes sold, so a resale buyer may have more time to compare homes than the median price alone suggests. A seller who wants top dollar is mostly competing with other resale listings, not with a builder's incentives.
Questions Buyers Ask About New Construction in Woodland Park
Is anyone building new homes in Woodland Park right now? Yes. The active construction is at The Haven at Paradise off Red Haven Place, where Western Mountain Builders is building semi-custom and custom homes on 24 homesites.
When could homes appear on the next Top of Paradise parcel? The master plan extension for the 38-lot Ventus parcel runs to August 4, 2030. At the August 2025 hearing, the applicant said they would be working with the city on a final plat and that topography may reduce the lot count.
Are new townhomes coming? Pines at Stone Ridge, which was proposed in 2022 as 49 townhomes and 20 patio homes, has since had its approved density reduced. Its approval was extended in June 2026 to April 14, 2028, and the applicant cited financing and market conditions. Tamarac Tech Park's 122-unit apartment approval runs to May 18, 2027, and the applicant plans a lower-density redesign.
If you're weighing a homesite at The Haven against a resale home on the same side of town, The Case Advantage is glad to tour both with you and talk through the timeline each one puts you on. Schedule a consultation before you commit to a lot or an offer, and start with our Woodland Park neighborhood page to see what's on the market today.